Adventurer Lane Cutoff Trench

PLDD PROJECT #6

  • Completion Date: 2005
  • Construction Cost: $11,000

Surface drainage from areas uphill of Adventurer Lane caused problems for the properties downhill of Adventurer Lane.

A french drain was installed from the north cul-de-sac of Adventurer Lane toward Port Ludlow Park. This French Drain picks up the water from the greenbelt to the west and routes it to the county ditch on the west side of Adventurer Lane and subsequently to Fleet Drive.

Construction
French Drain from Adventurer Lane to park

A new path to the tennis courts and park from Adventurer Lane was built by Joe Thompson.

The Park Trail
Path to tennis courts & park from Adventurer Lane