PLDD PROJECT #16
- Completion Date: 2014
- Construction Cost: 11,500 by District
LMC replaced the french drains around the north and northwest corner of the Beach Club. The project was designed and constructed by the LMC.
PLDD PROJECT #16
LMC replaced the french drains around the north and northwest corner of the Beach Club. The project was designed and constructed by the LMC.