PLDD PROJECT #3
Libby Court Outfall (Oak Bay Road Phase I)

  • Completion Date: 2004
  • Construction Cost: $120,500

The outfall pipe east of Montgomery Lane north of Libby Court was rusted and the bottom of the pipe was eroded. The pipe discharged at the top of the steep bank.

PLDD replaced the corroded top of bank discharge with an overbank discharge. This project installed a 30-inch diameter storm pipe from Montgomery Lane to a concrete diffuser structure on the beach. The pipe transitions from underground to above ground at the face of the bluff.