Port Ludlow Drainage District (pldd)

PLDD PROJECT #14
North Bay No. 2 Drainage Improvements

  • Completion Date: 2011
  • Construction Cost: $27,000

This improvement directed surface drainage, a large percentage of which is generated from Oak Bay Road, to an existing outfall to Ludlow Cove.

This improvement prevents bank sloughing from uncontrolled runoff.

Sheet flow from Oak Bay Road
Sheet flow from Oak Bay Road
Construction on North Bay Condos project (#14
Construction on North Bay Condos project (#14)
Drain running along North Bay Condos
Drain running along North Bay Condos