Scroll To Top

Port Ludlow Drainage District (pldd)

PLDD PROJECT #10
McCurdy Lane Cutoff Trench

  • Completion Date: 2008
  • Construction Cost: $32,500

Surface flow from the properties to the west of McCurdy Lane was discharging onto downstream properties. A french drain was installed to the west of McCurdy Lane to capture and direct surface drainage to the north.

french drain to the west of McCurdy Lane

Port Ludlow Drainage District
P.O. Box 65261
Port Ludlow WA 98365